VOL. XXXIV

NO. 32

13-MAY-1991

Saudi Arabia

FCC at Yanbu' Refinery Expected to Be Repaired within Ten Days

The fluid catalytic cracking (FCC) unit at the Pemref (Petromin-Mobil)refinery at Yanbu' developed minor operating problems on 7 May and has been shutdown for inspection. According to MEES sources, the unit is expected to be backin full operation within 10 days to two weeks.