VOL. XXXI

NO. 48

5-SEPTEMBER-1988

EGYPT

Hydroelectric Power Generation Expected to Go Back to full Capacity in TwoMonths

Eng. Muhammad Mahir Abazah, the Egyptian Minister of Electricity and Energy,has stated that he expects hydroelectric power generation at the Aswan High Damto go back to full capacity within two months, following the heavy rainfall inEast Africa and the subsequent rise in the water level in Lake Nasser behind thedam. He added that hydroelectric power generation at the dam, which...