Middle East Economic Survey

VOL. LIV

No 40

3-Oct-2011

CASPIAN

TAP And Geoplin Sign MOU For Slovenian Gas Pipeline

The Trans-Adriatic Pipeline (TAP) consortium and Slovenias transmission system operator Geoplin plinovodi on 27 September signed a memorandum of understanding for the proposed 10 bcm/year capacity Ionian-Adriatic Pipeline (IAP) project, a potential extension of the TAP pipeline that could be built on the premise of a future expansion of TAPs transit capacity to 20 bcm/y. Since...