SAUDI ARABIA
 
Petro Rabigh Cracker: Limited Restart
 
Petro Rabigh on 24 September restarted “all basic units” of its refining and petrochemicals complex, following an 11 September power and steam supply outage that damaged some furnaces in the ethane cracker. The Petro Rabigh complex is based around a 400,000 b/d refinery and 1.3mn tons/year ethylene plant. The company says the ethane cracker “started up with limited capacity (60mn cfd), to be operated at...