Middle East Economic Survey

VOL. LI

No 24

16-June-2008

TUNISIA

PA Resources Lifts Production At Didon To 16,000 B/D

Swedens PA Resources announced on 9 June that the drilling of its Didon-7 production well at Tunisias offshore Didon field had been completed and brought on-stream at a rate of 12,500 b/d. A pilot hole and a horizontal producer were drilled by the jack-up rig Ensco 85, prior to the well being brought into production, with the pilot hole encountering the top reservoir 5ms higher than...