VOL.XXXVI

NO.49

6-SEPTEMBER-1993

SYRIA

JohnBrownSuccessfully Tests Phase II Of Omar

Field'sWaterInjection Scheme

JohnBrown Engineers & Constructors of the UK has successfully tested the second stage of theOmar field's water injection scheme,which was installed atacostofabout

$75mn.Ithas a water injectioncapacity of 110,000 b/d and is intended to maintain thefield's pressure to sustain

an output of about 100,000 b/d.The firststageofthe Omarfield'swaterinjection scheme,worth about$100mn,

was...