1. Tamar Partners Sign Gas Sales Contracts

    ...ars if all volumes provided for in the agreement have not been consumed. Supply is expected to begin during the second half of 2014.  The Tamar partners on 9 December signed 16-year supply agreements with Ramat Negev Energy and Ashdod Energy, both of which are owned 58% by Edeltech and 42% by Zo...

    Volume: 55
    Issue: 03
    Published at Mon, 16 Jan 2012
  2. Noble To Resume Work On Leviathan-1 Well In Search Of Crude

    ...2bn and with deliveries scheduled to begin in 2014. GGR Plans Myra And Sarah Wells To Start Late February GeoGlobal Resources has confirmed to MEES that drilling will begin in Israel’s offshore Myra Block in late February using the Homer Ferrington rig. GGR will be targeting a gas prospect in th...

    Volume: 55
    Issue: 03
    Published at Mon, 16 Jan 2012
  3. Abu Dhabi Renews Cosmo Concessions

    ...nuary 2014 (MEES, 22 February 2010). The Cosmo renewal is the emirate’s second. ADNOC’s onshore gas division, GASCO, (ADNOC 68%, Shell 15%, Total 15%, and Portugal’s Partex 2%) had its concession renewed in March 2009, six months after it had expired. It was post dated to October 2008 and will ex...

    Volume: 54
    Issue: 03
    Published at Mon, 17 Jan 2011
  4. Azerbaijan Plans Gas Production Boost, More Exports In 2010

    ...sfield, which is nearing Stage 1 completion and producing 22-23mn cmd (8-8.4 bcm/y). Stage 2 development is expected to be completed in around 2014 and result in output doubling to 16 bcm/y. Shah Deniz reserves are estimated at 1.2 tcm. The EU and US backed Nabucco Gas Pipeline project is keen to se...

    Volume: 53
    Issue: 03
    Published at Mon, 18 Jan 2010
  5. Naftogaz Default Threat Warning By Ukraine Energy Official

    ...oject be completed in 2014 (MEES, 11 January). Throughput is expected to remain at current rate until the expansion is complete.   Turkmenistan resumed gas supplies to Russia on 9 January at a rate of 10 bcm/year following a meeting in late December between Turkmen President Gurbanguli Be...

    Volume: 53
    Issue: 03
    Published at Mon, 18 Jan 2010
  6. SEC Continues To Evaluate Bids For Riyadh PP11 IPP

    ...ficial launch to potential developers mid-year. This would become operational in 2014 and produce 2gw. This month SEC awarded an SR1.08bn ($288mn) contract to Arabian Bemco Contracting Company to expand a plant in Qassim, an agricultural region in the center of Saudi Arabia, said state news agency SP...

    Volume: 53
    Issue: 03
    Published at Mon, 18 Jan 2010