1. Azerbaijan Plans Gas Production Boost, More Exports In 2010

    ...sfield, which is nearing Stage 1 completion and producing 22-23mn cmd (8-8.4 bcm/y). Stage 2 development is expected to be completed in around 2014 and result in output doubling to 16 bcm/y. Shah Deniz reserves are estimated at 1.2 tcm. The EU and US backed Nabucco Gas Pipeline project is keen to se...

    Volume: 53
    Issue: 03
    Published at Mon, 18 Jan 2010
  2. Naftogaz Default Threat Warning By Ukraine Energy Official

    ...oject be completed in 2014 (MEES, 11 January). Throughput is expected to remain at current rate until the expansion is complete.   Turkmenistan resumed gas supplies to Russia on 9 January at a rate of 10 bcm/year following a meeting in late December between Turkmen President Gurbanguli Be...

    Volume: 53
    Issue: 03
    Published at Mon, 18 Jan 2010
  3. SEC Continues To Evaluate Bids For Riyadh PP11 IPP

    ...ficial launch to potential developers mid-year. This would become operational in 2014 and produce 2gw. This month SEC awarded an SR1.08bn ($288mn) contract to Arabian Bemco Contracting Company to expand a plant in Qassim, an agricultural region in the center of Saudi Arabia, said state news agency SP...

    Volume: 53
    Issue: 03
    Published at Mon, 18 Jan 2010
  4. Iraq’s TSC And PSC Agreements – A Good Deal For Iraq?

    ...reach production parity with Iran around 2014. After that, OPEC constraints are likely to peg Iraq’s production to that of Iran until 2019 or 2018 in the most likely or high cases for ‘call-on-OPEC’ respectively. Therefore, the call on Iraq’s crude oil production is forecast to be limited to 4-...

    Volume: 53
    Issue: 03
    Published at Mon, 18 Jan 2010