- Sort by:
- Score
- Published ▼
-
OMV Restarts Yemen Output
...15. Multiple firms with Shabwa basin operations say the region is safe from combat with upstream infrastructure intact. But pipeline attacks remain a perennial threat and employee safety a constant concern. Yemen produced 300,000 b/d before political stability nosedived in 2011. The 2010 co...
Volume: 61Issue: 16Published at Fri, 20 Apr 2018 -
Oman’s Forecasts 85% Power Demand Rise To 2021; Gas Shortage A Worry
...18 (MEES, 27 March). OPWP is also assisting the Rural Areas Electricity Company (Raeco) with a 120MW IPP in Musandam for start-up in 2016. Oman completed a 220KV link to the GCC grid in the UAE in 2011, and officially joined the GGC Interconnection Authority (GCCIA) in December. OPWP says this li...
Volume: 58Issue: 16Published at Fri, 17 Apr 2015 -
Iran Power Supply Up 4.6%, Capacity Hits 70GW
...n be viewed as remarkable progress given international sanctions. Recent international focus on Iran’s power sector has centered on the 1GW Bushehr nuclear plant, which western powers fear hides a nuclear weapons program. The plant has operated intermittently since 2011 start-up; it is currently sh...
Volume: 57Issue: 16Published at Fri, 18 Apr 2014