- Sort by:
- Score
- Published ▼
-
Egypt Allocates $3.36Bn For Electricity Sector In 2011-12
...nstruction of other solar energy plants, starting with a 100mw plant at Kom Ombo. He also said that a technical advisory agreement for a 250mw wind farm has been signed to be set up on a build-own-operate basis by 2014. ...
Volume: 54Issue: 16Published at Mon, 18 Apr 2011 -
RWE Opens Office In Ashgabat, Moves Ahead With Offshore Block 23
...st $32.2bn. The giant field is to come on stream in 2014 at a rate of 370,000 b/d. It will reach peak output of 1.5mn b/d around the end of the decade. Kazakhstan’s KazMunaiGaz (KMG) is considering borrowing $2bn this year, Bloomberg reported on 9 April. The company plans to invest $4.3bn during 20...
Volume: 53Issue: 16Published at Mon, 19 Apr 2010 -
Tatneft Begins Oil Production In Syria’s South Kishma Field
...cond quarter, with the development budget for the year at $15mn (MEES, 15 February). Another eight wells are projected for completion by 2014, when production from the field is expected to reach 4,500-5,000 b/d. South Kishma lies in the southeastern Deir Ez-Zor province on the border with Iraq and ha...
Volume: 53Issue: 16Published at Mon, 19 Apr 2010 -
Iran’s Oil Production Reached 4.3Mn B/D Last Year, Says Vaziri-Hamaneh
...a more consistent basis than in recent years, and recently declared its intention to raise capacity to 7mn b/d by 2014 (MEES, 27 November 2006)....
Volume: 50Issue: 16Published at Mon, 16 Apr 2007 -
Lebanon Cancels $844Mn Worth Of Cash Eurobonds
...sue, due to an international arbitration dispute with a former mobile operator LibanCell. The issues were intended to replace debt maturing in 2006. The cancellation covered two dollar-denominated issues worth $662mn ($73mn from the $750mn 2014 eurobond and $588mn from the 2012 $1.5bn eurobond) an...
Volume: 49Issue: 16Published at Mon, 17 Apr 2006