1. Kuwait, Oman And Qatar Push Refinery And Condensate Splitter Projects

    ...sref)   400,000 End 2014     UAE Ruwais   400,000 2013 10bn New refinery at sa...

    Volume: 55
    Issue: 18
    Published at Mon, 30 Apr 2012
  2. Abu Dhabi Capacity Expansion Schedule Slips By A Year

    ...pacity of about 500,000 b/d, will not be known until the project, which will start up in 2014, is at full capacity in 2016. ADNOC has not published any expected boosts, but under optimum conditions of structures and depth, 20% increases have been achieved elsewhere. ADCO says CO2 could free up as mu...

    Volume: 54
    Issue: 18
    Published at Mon, 02 May 2011
  3. Surging Demand Threatens Middle East Exports

    ...ursaniyah (1bn cfd, 2010), Karan (1.8bn cfd, in stages during 2011-13) and the Wasit Gas Plant (2.5bn cfd, 2014), Mr Falih said. Sales gas capacity will increase from 7bn cfd to 9.3bn cfd by 2015. Ethane production capacity will rise from 800mn cfd to 1.2bn cfd, while NGL production capacity will grow from 93...

    Volume: 53
    Issue: 18
    Published at Mon, 03 May 2010
  4. ADNOC Probes Options For Oil Concession Renewal

    ...tal (9.5% each); and Partex (2%). The concession expires in January 2014. ADMA for the offshore sector comprises: ADNOC (60%); BP (14.67%); Total (13.33%); and Japan Oil Development Company (Jodco – 12%). This concession ends in 2018. The presence and participation of the majors have provided te...

    Volume: 52
    Issue: 18
    Published at Mon, 04 May 2009