1. Qatar And Iran Outline GTL Plans At London Conference

    ...milar plant due into operation in 2011 (MEES, 27 October 2003). QP and Sasol-Chevron are negotiating to develop a second project labeled ORYX 2, with similar design and capacity to the project under construction, and which may be completed before the Shell plant begins production. Additionally, Mr Em...

    Volume: 47
    Issue: 21
    Published at Mon, 24 May 2004
  2. Iranian Petrochemical Sector Weighs Effects Of Capacity Expansion

    ...pacity would be required by 2011. Currently, there is a total of 8mn t/y of polypropylene capacity scheduled to come on stream by 2006. The polyethylene and polypropylene projects under construction are mainly in the Middle East, and according to Mr Borruso much of the exports from the region will be ab...

    Volume: 45
    Issue: 21
    Published at Mon, 27 May 2002