- Sort by:
- Score
- Published ▼
-
First Oil Export From UAE’s Belbazem
...velopment of Bu Haseer’s modest reserves economical, and Al Yasat has pursued a similar approach with Belbazem (MEES, 28 May). Outside of Al Yasat, CNPC is also present at Abu Dhabi’s largest concession, the 2mn+ b/d Adnoc Onshore concession. CNPC was awarded an 8% stake at Adnoc Onshore in 2017, ce...
Volume: 67Issue: 22Published at Fri, 31 May 2024 -
Lukoil Taps Yamama At West Qurna-2
...iticized Baghdad’s “delayed decision making,” and the firm has been frustrated by the slow pace of progression towards developing its 2017 2.5bn barrel-plus Eridu discovery located in Block 10 (60% op, 40% Inpex: MEES, 3 March 2017). The find was dubbed Iraq’s “largest in decades” and Iraqi officials say th...
Volume: 64Issue: 22Published at Fri, 04 Jun 2021 -
Egypt Inches Towards Paying Off Receivables Bill
...ll in late 2014 when it halved dues to $3.1bn on the back of borrowed cash (MEES, 5 December 2014). EGPC has pledged to pay off receivables by mid-2019. VICIOUS CIRCLE EGPC can point to the sums it is owed by other ministries as a reason it has fallen so far behind with payments. As of late 2017...
Volume: 61Issue: 22Published at Fri, 01 Jun 2018 -
WesternZagros Eyes Windfall From KRG Output Gains
...oduction. Shortly after WesternZagros confirmed the Crest offer, it announced that it has raised its 2017 revenue expectations up 40% on the back of increased Sarqala output. That said, WesternZagros exited Q1 with $22.5mn cash, down from $24.7mn at end-2016, according to results released 26 May. The Q1 re...
Volume: 60Issue: 22Published at Fri, 02 Jun 2017 -
Aramco Sees Gas As Central To Economic Transformation
...pending as it does on political as well as below-ground factors (see p14), easier to forecast is that Saudi NGLs output will continue to rise with that of gas. The IEA has Saudi NGLs output rising by 90,000 b/d between 2015 and 2017 and by a further 75,000 b/d by 2021, while Asia Pacific Energy Consulting pr...
Volume: 59Issue: 22Published at Fri, 03 Jun 2016 -
Business As Usual For ADCO After Majors’ Departure
...the fact that the fields lie in an environmentally sensitive area. The UAE is targeting production capacity of 3.5mn b/d from 2.8mn b/d currently through further development of its onshore and offshore fields by 2020, somewhat later than the original 2017-18 target. This delay is due to a host of...
Volume: 57Issue: 22Published at Fri, 30 May 2014 -
Egypt To Slash Petroleum Subsidies As Part Of New Budget
...% of GDP to health, education and scientific research by 2017, compared to 6% of GDP in 2013-14. It will aim to achieve sustained economic growth and restore confidence in the Egyptian economy, by adopting a number of reforms intended to correct structural imbalances in public finances, and achieve fi...
Volume: 57Issue: 22Published at Fri, 30 May 2014