- Sort by:
- Score
- Published ▼
-
UAE Delays, Jordan Rethink Blur Mena Nuclear Vision
...ntractor Status Iran Bushehr-1 2011 1.0 1 3....
Volume: 61Issue: 23Published at Fri, 08 Jun 2018 -
Saudi Generator Hikes Capacity By 6%, Fuel Flexibility The Key
...C’s share of total Saudi installed capacity fell from a peak of 82% in 2011 to 74% for 2014. The company says that its actual volume of generated electricity exceed the company’s planned volume for 2014 by 9.1%. However, the company improved the average thermal efficiency of its plants by 1% co...
Volume: 58Issue: 23Published at Fri, 05 Jun 2015 -
Saudi-Egypt Power Link Deal Signed, But GCC Grid Usage ‘Minimal’
...en Oman was connected (see map). But whilst the GCC grid has achieved its primary objective of increasing cross-border electricity supply –unscheduled power exchange doubled from 2010 to 2011 and from 2011 to 2012, according to GCCIA CEO Ahmad al-Ibrahim – traded energy fell to zero in 2012 after a fl...
Volume: 56Issue: 23Published at Fri, 07 Jun 2013