1. Abu Dhabi Raises Crude Production Capacity Target

    ...t their targets. The Supreme Petroleum Council is to decide the future of ADCO’s concessions, which cover the emirate’s major onshore producing fields and which are due to expire in January 2014. More than 10 firms have been invited to prequalify by mid-July (MEES, 25 June). This will be the co...

    Volume: 55
    Issue: 27
    Published at Mon, 02 Jul 2012
  2. Qatargas Seals 20-Year LNG Supply Deal With Argentina’s ENARSA

    ...e delivery of 5mn tons/year of LNG. This would be delivered to ENARSA’s Southern Cone LNG hub – an offshore LNG floating storage and regasification unit – for a period of 20 years. This deal, starting in 2014, is Qatargas’s first long term supply agreement with a South American country, and is ex...

    Volume: 54
    Issue: 27
    Published at Mon, 04 Jul 2011
  3. Kazakhstan Introduces New Subsoil Law, Enhancing State Leverage

    ...ginning will be delayed. We therefore, expect no substantial volumes of oil in the period from 2014 to 2016 to justify construction of the KCTS.” However, KCTS is due to be completed in 2016-17 to handle expanded output from Kashagan (MEES, 7 June)....

    Volume: 53
    Issue: 27
    Published at Mon, 05 Jul 2010
  4. Musturud Refinery Project Attracts Additional Lenders

    ...mpletion is planned for 2014....

    Volume: 53
    Issue: 27
    Published at Mon, 05 Jul 2010
  5. Poland Signs Long-Term Agreement For Qatari LNG

    ...d Polish state firm PGNiG, and calls for the delivery of 1.5 bcm/year of gas (1mn tons/year of LNG) over the period 2014-34 to an LNG receiving terminal to be built at Swinoujscie on Poland’s Baltic Sea coast. Mr Grad said that the contract would be worth around $500mn/year, and that the LNG wo...

    Volume: 52
    Issue: 27
    Published at Mon, 06 Jul 2009
  6. Saudi Aramco And ConocoPhillips Relaunch Yanbu' Refinery Bidding

    ...re being floated around last year. Major packages for Yanbu', which is scheduled to start up in the third quarter of 2014, include a coker unit, crude facility, gasoline unit, hydrocracker, tank farm, offsite pipelines and high voltage electrical packages, as well as other infrastructure pa...

    Volume: 52
    Issue: 27
    Published at Mon, 06 Jul 2009