- Sort by:
- Score
- Published ▼
-
Iraq: Crisis Remains At The Door Despite Badra Start Up
...oil from the south to attain its production and export targets. Badra is due to ramp up to 60,000 b/d by the end of the year and attain plateau production of 170,000 b/d by 2017. Once commercial production is attained, the foreign contractors will be paid a remuneration fee of $5.5/B. Gazprom Ne...
Volume: 57Issue: 30Published at Fri, 25 Jul 2014 -
MENA Leads OPEC Refining Hike As First Mega-Refinery Comes Onstream
...wly released Annual Statistical Bulletin 2014. The data includes the first of the Gulf mega-refineries to be completed: the 400,000 b/d Satorp joint venture of Saudi Aramco and France’s Total. The similar-sized Aramco/Sinopec Yasref refinery and Aramco Jazan refinery are due onstream in 2014 and 2017...
Volume: 57Issue: 30Published at Fri, 25 Jul 2014 -
Oman Ramps Up Plant Construction To Meet Rising Power Demand
...mpany has started the bidding process for an engineering, procurement and construction (EPC) contract, with a start-up target of 4Q16. OPWP has also requested proposals for a 200,000 cmd IWP at Qurayyat, with a view to start-up in March 2017. OPWP has shortlisted sites in the Ibri, Sohar and Suwaiq re...
Volume: 57Issue: 30Published at Fri, 25 Jul 2014 -
Jazan Development: Saudi Aramco Sprints To The Rescue
...nopec 400 Jazan (2017) 100 400 End-2017 Domestic 3,305 Port Arthur, US 50...
Volume: 57Issue: 30Published at Fri, 25 Jul 2014