1. Iraq: Crisis Remains At The Door Despite Badra Start Up

    ...oil from the south to attain its production and export targets. Badra is due to ramp up to 60,000 b/d by the end of the year and attain plateau production of 170,000 b/d by 2017. Once commercial production is attained, the foreign contractors will be paid a remuneration fee of $5.5/B. Gazprom Ne...

    Volume: 57
    Issue: 30
    Published at Fri, 25 Jul 2014
  2. MENA Leads OPEC Refining Hike As First Mega-Refinery Comes Onstream

    ...wly released Annual Statistical Bulletin 2014. The data includes the first of the Gulf mega-refineries to be completed: the 400,000 b/d Satorp joint venture of Saudi Aramco and France’s Total. The similar-sized Aramco/Sinopec Yasref refinery and Aramco Jazan refinery are due onstream in 2014 and 2017...

    Volume: 57
    Issue: 30
    Published at Fri, 25 Jul 2014
  3. Oman Ramps Up Plant Construction To Meet Rising Power Demand

    ...mpany has started the bidding process for an engineering, procurement and construction (EPC) contract, with a start-up target of 4Q16. OPWP has also requested proposals for a 200,000 cmd IWP at Qurayyat, with a view to start-up in March 2017. OPWP has shortlisted sites in the Ibri, Sohar and Suwaiq re...

    Volume: 57
    Issue: 30
    Published at Fri, 25 Jul 2014
  4. Jazan Development: Saudi Aramco Sprints To The Rescue

    ...nopec 400 Jazan (2017) 100   400 End-2017 Domestic     3,305 Port Arthur, US 50...

    Volume: 57
    Issue: 30
    Published at Fri, 25 Jul 2014