- Sort by:
- Score
- Published ▼
-
Abu Dhabi’s Gas Crunch Worsens
...Middle East Economic Survey VOL. LIII No 32 9-Aug-2010 MEES Agenda Abu Dhabi’s Gas Crunch Worsens Abu Dhabi’s gas crisis will worsen until 2014, and continue until 2017 unless it finds an alternative to domestic gas, due to delays in major development projects. It already faces a 2b...
Volume: 53Issue: 32Published at Mon, 09 Aug 2010 -
Dragon Oil Output Averages 46,420 B/D In 1H 2010
...10, the CPC transported 20.105mn tons of Kazakh and Russian crude, compared with 20.122mn tons for the same period last year. During 2009, the CPC shipped a total of 34.574mn tons, compared to 31.47mn tons in 2008. The capacity of the pipeline is to be expanded to 67mn tons (1.34mn b/d) by 2014, wi...
Volume: 53Issue: 32Published at Mon, 09 Aug 2010 -
ERC Signs $2.6Bn Financing Agreement For Musturud Refinery
...n t/y of diesel. Products will supply the domestic market, especially Cairo, where the project will be located. The engineering procurement and construction (EPC) contractors are Japan’s Mitsui and Korea’s GS Engineering. Completion is planned for 2014....
Volume: 53Issue: 32Published at Mon, 09 Aug 2010 -
Morocco Invites Pre-Qualification Bids For Phase 1 Of Solar Project
...for the design, financing, construction, operation and management of one or more thermo-solar units at Ouarzazate with capacities of at least 125mw, to begin operations in 2014. The complex will be located on a 33 sq km site in central Morocco, 4km from the Mansour Eddabi dam. Total desired ca...
Volume: 53Issue: 32Published at Mon, 09 Aug 2010