1. Libya Eyes 10,000 B/D 1H24 Output At North Hamada

    ...w a pipeline connection between Tahara and the parallel El Feel/Sharara to Zawiya/Mellitah trunk crude pipelines. Full development of the seven fields on Area 47’s Block 2 on which commerciality was declared in 2011 and 2014 is slated to produce 50,000-60,000 b/d liquids and 90mn cfd gas with ou...

    Volume: 66
    Issue: 35
    Published at Fri, 01 Sep 2023
  2. Lebanon Hooked On Diesel Imports Amid Financial Crisis

    ...ich runs through Jordan and Syria. Even these volumes were only ever sufficient to supply one of its two gas turbines, while flows were sporadic and halted entirely following attacks on the pipeline in Egypt’s Sinai Peninsula in 2011. Meanwhile the Zahrani power plant lacks the required infrastructure to...

    Volume: 66
    Issue: 35
    Published at Fri, 01 Sep 2023