- Sort by:
- Score
- Published ▼
-
Mitsui, GS Engineering To Build Hydrocracker At Mostorod Refinery
...e 135,000 b/d Mostorod oil refinery north of Cairo. The units, which will boost diesel and other middle distillate output, are expected to come on-stream by 2011. According to GS, the units include an 80,000 b/d vacuum distillation unit and a 40,000 b/d hydrocracker....
Volume: 50Issue: 36Published at Mon, 10 Sep 2007 -
Technip Wins FEED For Al-Shaheen Refinery
...d of 2011....
Volume: 50Issue: 36Published at Mon, 10 Sep 2007 -
Saudi Aramco Oil Output Down 1.7% in 2006 At Average 8.9Mn B/D
...lls by 2011. In the next 10 years, we hope to add 50 tcf to our current 248.5 tcf of gas reserves,” it said. Major Gas Discoveries In 2006 (Mn CFD) Well Gas Flow Condensate Location Depth Field Karan-6 80...
Volume: 50Issue: 36Published at Mon, 10 Sep 2007