- Sort by:
- Score
- Published ▼
-
NIOC To Bring In Chinese Heavy Oil Expertise
...heavy crude oil: “The refinery is at the basic engineering designing phase, with 5% of physical progress completed.” The unit is scheduled to become operational in 2011 (MEES, 14 April 2008)....
Volume: 51Issue: 36Published at Mon, 08 Sep 2008 -
NPC Earmarks 20 Subsidiary Companies For Privatization
...onomic Commission Allocates Extra €370Mn For Completion Of Petrochemical Plants Iran’s Economic Commission has increased funding for the Kavian, Mahabad and Lorestan petrochemical projects in order to ensure their completion by the existing 2011 deadline, Mehr News Agency reported on 3 September. Th...
Volume: 51Issue: 36Published at Mon, 08 Sep 2008 -
Iran’s Oil And Gas Export Earnings Up 32% To $81.8Bn In March 2008
...670 1390 (2011-12) 2.210 1391 (2012-13) onwards 6.844...
Volume: 51Issue: 36Published at Mon, 08 Sep 2008 -
Parsons Brinckerhoff Appointed Owner’s Engineer For Qatar’s Ras Laffan C IWWP
...tar, the company announced on 19 August. Ras Laffan C is being developed on a fast-track basis to help meet the demand for electricity in Qatar, which is rising at the rate of about 17% annually. Located in Ras Laffan Industrial City, the project will produce some 2.73gw of power beginning in 2011 an...
Volume: 51Issue: 36Published at Mon, 08 Sep 2008 -
The Georgia-Russia Standoff And The Future Of Caspian And Central Asian Energy Supplies
...rst successful new oil export project. The 3,000km Atyrau-Alashankou oil pipeline is scheduled to be completed in several stages by 2011 and is projected to bring around 200,000 b/d of Caspian oil to China (20mn tons/year annually, with the potential to reach 50mn t/y). 5. For a thorough as...
Volume: 51Issue: 36Published at Mon, 08 Sep 2008