- Sort by:
- Score
- Published ▼
-
Iraq Sends Record Volumes To Its Refineries
...finery – once the country’s largest at 310,000 b/d capacity prior to being overrun by the Islamic State in 2014 (MEES, 26 September 2014). Oil Minister Jabbar al-Luaibi announced the rehabilitation of the refinery’s 70,000 b/d Salahuddin-2 unit on 9 September, although it is unlikely that it is capable of op...
Volume: 61Issue: 42Published at Fri, 19 Oct 2018 -
Newly Streamlined Adnoc Targets EOR Expertise For Offshore Fields
...NTED The 2014 renewal of Abu Dhabi’s 1.6mn b/d onshore Adco concession was seen as a blueprint for the looming Adma renewal. While Abu Dhabi won’t want to replicate the lengthy process of securing foreign partners, which was only completed in December 2016 (MEES, 23 December), elements are set to be re...
Volume: 60Issue: 42Published at Fri, 20 Oct 2017 -
Saudi Speciality Petchems Transformation Focuses On Aromatics
...omatics/Propylene: 2,200 Paraxylene Satorp, Jubail 700 2014...
Volume: 57Issue: 42Published at Fri, 17 Oct 2014 -
Iraq Signs Misan Deal With Satarem As Refineries Program Gathers Pace
...vernment’s equity and offtake and products pricing. The ministry is looking for a construction start in 2014 with a view to completion in 2018. Shaw Group – subsequently taken over by fellow US contractor CB&I – was awarded contracts for a feasibility study and front-end engineering design (FEED) fo...
Volume: 56Issue: 42Published at Fri, 18 Oct 2013 -
SABIC Chief Calls For Support
...8%, increase ethylene output by 2% and “transform the cracker into one of the best in Europe.” Mr Mady told reporters at the meeting that SABIC aims to decide by the end of 2014 on developing a new cracker in the US to process shale gas. Discussions are under way with a number of potential pa...
Volume: 56Issue: 42Published at Fri, 18 Oct 2013 -
ENPPI Upbeat On Ethydco Ethylene Project
...EGYPT ENPPI Upbeat On Ethydco Ethylene Project The Egyptian Ethylene and Derivatives Company (Ethydco) ethylene project will be completed in 2014 at a cost of $1.2bn, according to Engineering for the Petroleum and Process Industries (ENPPI) Chairman and CEO ‘Abd al-Nasir Sa...
Volume: 55Issue: 42Published at Fri, 12 Oct 2012