- Sort by:
- Score
- Published ▼
-
Egypt Nuclear Plans Near Go-Ahead, Saudi Looks To Standardize Plant Design
...erating: Iran Bushehr-1 2011 1.0 1 3.5 Rosatom built. Operation intermittent until 20...
Volume: 60Issue: 48Published at Fri, 01 Dec 2017 -
Oil-Poor Arab States Get Multilateral Finance Boost For Renewables
...ectricity from renewables. EBRD and IFC began investing in energy projects in Egypt, Jordan, Morocco and Tunisia as part of the IMF’s ‘Arab Countries in Transition Program’ which followed the 2011 ‘Arab Spring.’ This targeted these four countries plus Yemen and Libya (MEES, 24 October 2014). At the re...
Volume: 59Issue: 48Published at Fri, 02 Dec 2016 -
GCC Grid Growth Stalled As Oman Set To Join
...GWh in 2010 to 815GWh in 2013, though even the higher figure represents less than 0.25% of regional demand. Scheduled trading started at 0.31GWh in 2010 and rose to 46GWh in 2011, but has been zero ever since (see chart). Announcing Oman’s decision to join the GCC grid, GCCIA director Matar al-Ni...
Volume: 57Issue: 48Published at Fri, 28 Nov 2014 -
Oman Plans First Solar Unit Under Rural Plan
...pacity is linked to two grids: the Main Interconnected System (MIS) and the Salalah system. This year peak MIS demand is expected to reach 4.82GW, with 424MW in Salalah (MEES, 24 May). But off-grid rural demand is growing faster than in the main networks, having recorded an 11.6% increase from 2010 to 2011...
Volume: 56Issue: 48Published at Fri, 29 Nov 2013 -
Iran Nuclear Plant Shut Down, UAE Gauges Impact Of Korea Safety Scam
...rrently on hold (MEES, 7 September). Iran Nuclear Power Plants Location Capacity (MW) Status Bushehr 1,000 Start-up September 2011. Reached full capacity September 20...
Volume: 55Issue: 48Published at Fri, 23 Nov 2012