- Sort by:
- Score
- Published ▼
-
Caspian Services Begins Phase 1 Work On Bautino Marine Facility
...TIC Group sold 50% of Karazhanbasmunai to state-owned KazMunaiGaz Exploration and Production (KMG EP) earlier this year (MEES, 22 October). The oilfield has proven reserves of 363.8mn barrels. Production is around 45,000 b/d and target production is set to double by 2011. KazMunaiGaz an...
Volume: 50Issue: 51Published at Mon, 17 Dec 2007 -
Citadel Refinery Financing Progresses, Pathfinder Banks To Be Appointed
...ope because it includes a coker to optimize diesel production. It is 85% owned by Citadel with Egyptian General Petroleum Corporation (EGPC) holding the remainder, and the two have formed a holding company, Egypt Refining Company (ERC). It will start up in 2011 producing 2.2mn tons/year of diesel (in...
Volume: 50Issue: 51Published at Mon, 17 Dec 2007 -
SPLM Agrees To Rejoin National Unity Government As Talks Resume
...ke place in 2009, and the referendum on unity, scheduled for 2011. ...
Volume: 50Issue: 51Published at Mon, 17 Dec 2007 -
Sonatrach And Gaz De France Extend LNG Contracts To 2019
...eld development plan to the Algerian authorities during the summer of 2007 and production is due to start up in late 2011 (MEES, 7 May, 26 February). Khelil: Long-Term Gas Contracts May Be Scrapped Algerian Minister of Energy and Mines Chakib Khelil was quoted on 3 December by state news agency AP...
Volume: 50Issue: 50Published at Mon, 10 Dec 2007 -
GE To Supply Compression Trains For NCP Ethylene Project
...evron Phillips – SCP) ethylene cracker plant in Jubail, which will have a 1.165mn t/y capacity when it comes on-stream in 2011. The compression trains will consist of cracked gas, propylene refrigerant and binary refrigerant compressors, and are being manufactured by GE Oil & Gas at its facilities in...
Volume: 50Issue: 50Published at Mon, 10 Dec 2007 -
NIORDC Announces Essar Exit From Bandar Abbas Heavy Oil Refinery
...gotiations were under way with other local and international companies for the construction of the refinery, which NIORDC aims to bring on-line in 2011 (MEES, 15 January)....
Volume: 50Issue: 49Published at Mon, 03 Dec 2007 -
Kuwait’s New Non-Associated Gas To Cover Medium-Term Local Demand, Says NBK
...tural gas production is set to begin this month at a rate of 175mn cfd, and thereafter be ramped up to 600mn cfd in 2011 and 1bn cfd by 2015. “At the moment,” the NBK report says, “Kuwait is (notionally at least) self-sufficient in natural gas, consuming all that it produces as a by-product of its cr...
Volume: 50Issue: 49Published at Mon, 03 Dec 2007 -
Caspian/Iraq Export Pipelines
...05). Work on the mid-section (Kenkiyak-Kumkol) set for 2011 start. Expansion to 400,000 b/d capacity likely, to meet Kazakh oil output rise. 14. Atyrau-Kuryk Crude Oil Pipeline. Kazakhstan’s KazTransOil operates domestic pipeline between Aktau – from where some crude oil exported – and Atyrau, ru...
Volume: 49Issue: 52Published at Mon, 25 Dec 2006 -
Energy Security Ties Between East Asia And Central Asia: Power Games Or Partnership
...ina pipeline plan fell off the table around 2003 due, perhaps, to the intervention by Japan. The Kazakh-China oil pipeline construction started in September 2004. The first phase was completed in December 2005 (960km), and the total pipeline will be completed by 2011, stretching over 3,000km. Cu...
Volume: 49Issue: 51Published at Mon, 18 Dec 2006 -
Pars LNG And China Sign 3Mn T/Y Preliminary LNG Supply Agreement
...rst deliveries in 2011 (MEES, 10 July). Iran’s efforts to secure combined upstream/LNG sales agreements with China and India have so far not succeeded because of LNG pricing differences (MEES, 4 December)....
Volume: 49Issue: 50Published at Mon, 11 Dec 2006 -
Audit Bureau Highlights Strategic Failures In Kuwait’s Oil And Gas Sector
...mmissioning of the fourth refinery and the closure of the ageing Shu'aiba plant will be to lift national refining capacity from 930,000 b/d now to 1.5mn b/d by 2011, implying that the expansions will lift the two existing plants’ capacity by 150,000 b/d collectively. The fourth refinery is expected to come on-st...
Volume: 49Issue: 49Published at Mon, 04 Dec 2006 -
Kazakhstan And China Inaugurate Crude Oil Pipeline
...zMunaiGaz, which put the cost of the project at $806mn. Deliveries of Kazakh oil from the central Kumkol district should arrive at the Chinese border by the middle of 2006. The project calls for capacity to be increased to 20mn t/y (400,000 b/d) by 2011 and at some point the pipeline may be used to tr...
Volume: 48Issue: 51Published at Mon, 19 Dec 2005 -
Bahr Al-'Ulum Sets Sights On 3Mn B/D Oil Output By End 2006
...-'Ulum said that Iraq would increase oil production from 1.8mn b/d to 2mn b/d by the end of the year (MEES, 28 November). He added that Iraq aimed to lift production to 3.5mn b/d within the next two years and on to 6mn b/d by 2011. Iraq produced 1.65mn b/d in November according to MEES es...
Volume: 48Issue: 51Published at Mon, 19 Dec 2005 -
Qatar GTL Developments On Track, Says ʹAttiyah
...iftly by Phase-2. Finally, ExxonMobil’s integrated 154,000 b/d GTL project is on schedule for 2011 start-up, he said. “Our strategy is to achieve best utilization of our country’s natural resources and to diversify the gas industry; GTL provides the true opportunity in terms of scale and technology to...
Volume: 48Issue: 49Published at Mon, 05 Dec 2005 -
Saudi Hollandi Bank To Issue Bond
...ll depend on investors’ demand. The subordinated callable floating rate notes are tradable and have a maturity term of seven years (they are due in 2011). The special feature of this offering is to grant the issuer a call option after a five-year period. While this structure is in line with tier-II...
Volume: 47Issue: 50Published at Mon, 13 Dec 2004 -
Nexen Announces First Oil From Yemen Block 51
...ggest-producing field in Yemen. Production is averaging around 230,000 b/d, with Nexen’s share, 119,000 b/d. The PSA covering Masila runs to 2011, with a five-year negotiable extension....
Volume: 47Issue: 49Published at Mon, 06 Dec 2004 -
…Qatar Airways Increases Previous Aircraft Order By $1.2Bn
...VOL. XLVI No 50 15-December-2003 INFRASTRUCTURE QATAR …Qatar Airways Increases Previous Aircraft Order By $1.2Bn Qatar Airways has said that it will increase its fleet to 52 aircraft in the next five years and to 56 aircraft by 2011 and has recently extended its previous order to bu...
Volume: 46Issue: 50Published at Mon, 15 Dec 2003 -
Global Energy Investment Needs To 2030
...llars) Share of Total Total 2001-30 2000 2001-10 2011-20 2021-30 2001-30 (%) Oil 87...
Volume: 46Issue: 49Published at Mon, 08 Dec 2003 -
Poverty In Yemen Climbing As Employment Fails To Keep Pace With Labor Force Growth…
...end continues, the rate of open employment will rise to about 27% by 2011 and about 37% by 2025. Furthermore, if the rate of part or hidden unemployment at the 1999 level is added, the open employment rate will be more than 60% of the labor force by 2011 and rise to 70% by 2025. It will, warns Mu...
Volume: 44Issue: 49Published at Mon, 03 Dec 2001