1. Eni Discovers 1tcf Offshore Libya

    ...t to reach a depth of up to 4,500 meters (15,000 feet) once drilling is completed. Block 38 falls within the giant offshore ‘Area C’, awarded to BP in a landmark 2007 deal (MEES, 4 June 2007). After development plans were disrupted by the 2011 revolution and the ensuing instability, Eni took ov...

    Volume: 69
    Issue: 12
    Published at Fri, 20 Mar 2026
  2. Libya: Mabruk Oil Field Hits 25,000 b/d

    ...st few years, with oil output finally hitting a record 1.374mn b/d for 2025, the highest figure in 15 years (MEES, 2 January). This comes as IOCs have ramped up drilling activities for the first time since the 2011 revolution, with existing partners reporting stronger performance and a positive ou...

    Volume: 69
    Issue: 10
    Published at Fri, 06 Mar 2026