- Sort by:
- Score
- Published ▼
-
Abu Dhabi To Import 1.2Bn CFD Of LNG, Shah Gas Field Slips
...UAE Abu Dhabi To Import 1.2Bn CFD Of LNG, Shah Gas Field Slips Abu Dhabi’s decision to start importing LNG in 2014-15 will put it into competition with Kuwait and Bahrain for floating regasification and storage units (FRSUs), whose market is tight. Positioning the terminal in Fu...
Volume: 55Issue: 13Published at Mon, 26 Mar 2012 -
BP Begins Production At North Shadwan
...EGYPT/EAST MEDITERRANEAN BP Begins Production At North Shadwan BP has started production from its North Shadwan block in Egypt’s Gulf of Suez. Initial production of 1,000 b/d from the block’s NS 377 field will ramp up to 12,000 by 2014 as two further fields on the block come on st...
Volume: 55Issue: 12Published at Mon, 19 Mar 2012 -
SEC Seeking Developers For Power Plant Based On Fuel Oil
...oviding equipment and start-up is scheduled for June 2014. SEC’s second IPP, a Riyadh gas-fired project, is being developed by GDF Suez, Aljomaih Holding Company of Saudi Arabia and Sojitz Corporation of Japan. Commonly known as PP11, it will generate 1.73gw, with early power expected by May 20...
Volume: 55Issue: 12Published at Mon, 19 Mar 2012 -
Korean Group Wins Abu Dhabi Oil Deal As ADCO Concession Nears Expiry
...ports. The concession for the ADCO consortium – ADNOC (60%), Shell, Total, BP and ExxonMobil (9.5% each) and Portugal’s Partex (2%) – will expire in January 2014. An international oil company (IOC) official, whose firm plans to compete when the ADCO concession ends, tells MEES about the Korean deal: “I su...
Volume: 55Issue: 11Published at Mon, 12 Mar 2012 -
Kuwait’s Jurassic Gas Project Hits More Problems
...oduce 50-60mn cfd of associated gas. Onshore, a project in Wafra field will collect 100mn cfd of associated gas by 2014 to use for in-field power generation. KNPC and KOC have programs to reduce flaring, but do not publish figures. KOC is relying on exploration to find 1bn cfd of non-as...
Volume: 55Issue: 10Published at Mon, 05 Mar 2012 -
Australia’s Beach Sees ‘Imminent’ Start to Egyptian Production
...ys initial production from the BP-operated block is “imminent”, with first oil coming from the NS 377 field. Production is set to build to around 12,000 b/d by 2014 as other fields come on stream. Of the block’s discoveries, NS 377 is the nearest to the Sinai coast (see map). Production fr...
Volume: 55Issue: 10Published at Mon, 05 Mar 2012 -
Political Comment (5 March 2012)
...id and issued at the meeting of the enemies of Syria in Tunis" and to press ahead with Mr Asad's 26 February referendum on a new constitution, which would allow the president to serve two further seven-year terms when his current term expires in 2014. (According to the government, the constitution wa...
Volume: 55Issue: 10Published at Mon, 05 Mar 2012