1. Libya’s East-West Divide Flares Up Amid Oil Port Fighting

    ...me by. LIBYA’S 2017 OUTPUT TARGETS BY JV (‘000 B/D) ^ACTUAL JAN-FEB OUTPUT WAS 680,000 B/D. SOURCE: NOC.   NOC SPLIT RENEWED On 14 March an LNA spokesman said that a decision over control of the oil terminals would not be reached before they had been inspected by Naji al-Ma...

    Volume: 60
    Issue: 11
    Published at Fri, 17 Mar 2017
  2. Algeria’s LNG Sales Shrink Further, Piped Gas Jumps 49%

    ...t/y) Start End Import Country Comments Eni 1.33 1997 2017...

    Volume: 60
    Issue: 09
    Published at Fri, 03 Mar 2017
  3. India Presses Buyers’ Advantage In Oversupplied LNG Market

    ...though there is probably more potential upside than downside to the forecasts given the expectation that these low prices will persist. We forecast another 2.4mn tons (15%) increase year-on-year of gas imports in 2017,” they say. The successful renegotiation with RasGas has now set a precedent and gi...

    Volume: 59
    Issue: 11
    Published at Fri, 18 Mar 2016
  4. His Mission Accomplished, Qatar’s Attiyah Bows Out

    ...e PSA with Maersk is set to expire in 2017.  US firm Occidental Petroleum, has stabilized production at the 100,000 b/d Idd al-Shargi offshore field through extensive horizontal drilling and waterflooding. It is now waiting for the green light from QP to proceed with fifth phase development af...

    Volume: 58
    Issue: 12
    Published at Fri, 20 Mar 2015
  5. Jordan Advances Gas Strategy With Shell LNG Supply Deal

    ...peline plans currently stand, a 2.5mn b/d line will connect Basra oil to Haditha. A 1,000 km, 1mn b/d line will then connect Haditha to ‘Aqaba, with first oil through the pipeline expected by end of 2017 or beginning of 2018 (MEES, 28 February).   Iraqi Crude Supplied To Jordan By Truck (‘000 B/D)...

    Volume: 57
    Issue: 10
    Published at Fri, 07 Mar 2014
  6. Egypt Eyes Iraqi Gas

    ...e transit of 1mn b/d of crude, whilst a parallel gas pipeline would carry 138mn cfd (MEES, 28 February). Both are slated for completion in 2017 or early 2018. Once an exporter of gas to Jordan, Syria and Israel, Egypt is now struggling to meet its domestic demand, and is forecasted to slump in...

    Volume: 57
    Issue: 10
    Published at Fri, 07 Mar 2014
  7. Dolphin Prepares For 1.2Bn CFD Gas Boost

    ...E sources say. Faced with importing LNG at up to $18/mn BTU, or waiting until 2017 for gas to come from development of Abu Dhabi’s Bab field, or nuclear power to start up, more Qatari pipeline gas – at the price Doha wants – looks like a good deal.   Qatar does, however, have another medium-te...

    Volume: 56
    Issue: 12
    Published at Fri, 22 Mar 2013
  8. Oman LNG Exit May Leave Qatar As Sole Exporter

    ...pacity – just enough to meet term contracts. It hopes BP’s tight gas project coming on stream in 2017 will temporarily ease the crisis.   Abu Dhabi could end LNG production in March 2019 when a contract expires to sell 4.7mn t/y to Japan’s Tokyo Electric Power Company (TEPCO). By then, the two 1m...

    Volume: 56
    Issue: 10
    Published at Fri, 08 Mar 2013