- Sort by:
- Score
- Published ▼
-
Turkey Seeks To Attract Private Investors To Southeastern Anatolia
...be completed in 2014. A hydroelectric generation facility at the dam will have a 1,200mw capacity that will produce 3.8mn khw annually. The dam will create a lake that will hold 11bn cu ms of water. However, there is strong opposition from European NGOs that are pressing the EU to hold back fi...
Volume: 50Issue: 47Published at Mon, 19 Nov 2007 -
Russia Remains At Odds With Other CPC Partners Over Pipeline Expansion
...pensive than that charged by Russian pipeline monopoly Transneft for transport through its system. Moscow is said to be looking to have the debt paid down by 2012 instead of 2014 as previously planned. Moscow is also said to want the consortium run by a board of directors instead of a shareholders’ co...
Volume: 49Issue: 48Published at Mon, 27 Nov 2006 -
NIOC Officials Update On Oil Production And Refining Targets
...OC) Managing Director Gholamhossein Nozari announced on 20 November that the company was aiming to increase its oil production capacity to 7mn b/d by 2014, while at the same time increasing gas production capacity to 1.565bn cmd (55.30bn cfd). Addressing the 11th International Oil & Gas Forum in Te...
Volume: 49Issue: 48Published at Mon, 27 Nov 2006 -
AIOC Delays MEP Route Decision; Turkey And US Labor For Baku-Ceyhan
...a port of Novorossysk. The CPC pipeline will cost some $2.3bn and have an initial capacity of 560,000 b/d, rising to 1.34mn b/d by 2014, when Tengizchevroil production is targeted for around 700,000 b/d (MEES, 19 October). TCO hopes to boost its production in Tengiz to 260,000 b/d sometime during 20...
Volume: 41Issue: 44Published at Mon, 02 Nov 1998