- Sort by:
- Score
- Published ▼
-
BP Says New Shah Deniz Discovery ‘Potentially Significant’
...e fourth corridor for gas supply to Europe will be made.” Azerbaijan has forecast gas production to reach 32.41 bcm/y in 2011 (MEES, 12 November, 15 October). Shah Deniz Gas Reservoirs Source: BP Azerbaijan. Azerbaijani gas exports to Europe would be made via the South Caucasus Pi...
Volume: 50Issue: 47Published at Mon, 19 Nov 2007 -
Azerbaijan Gas Production Forecast To Reach 32 BCM/Year In 2011
...Middle East Economic Survey VOL. L No 46 12-November-2007 CASPIAN Azerbaijan Gas Production Forecast To Reach 32 BCM/Year In 2011 Azerbaijan has forecast gas production to reach 32.41 bcm/year in 2011. Of this, 15.8 bcm/y will come from the offshore Azeri-Chirag-Guneshli (ACG) oi...
Volume: 50Issue: 46Published at Mon, 12 Nov 2007 -
Power Generation In The Middle East: Can The Boom Continue?
...timated that the Arab countries are expected to build 48gw of new capacity over that period, thus raising the power generation capacity from 138gw in 2006 to 186gw in 2011, ie by 35% in five years, an average of 6.2% annually. This is the same high rate that has persisted on average over the last two de...
Volume: 50Issue: 46Published at Mon, 12 Nov 2007 -
APEC Predicts Growing Role For Middle East Condensate In Asia-Pacific Market
...rough 2010, but growth in condensate production will slow post-2010: “As in Saudi Arabia, Iran and Qatar, the UAE will add condensate splitting capacity by end-decade.” APEC Outlook For Middle East Condensate Production (‘000 B/D) 2006 2009 2011 2015 Sa...
Volume: 50Issue: 45Published at Mon, 05 Nov 2007 -
100% Kuwaiti Employment In KOC Would Leave Oil Sector Isolated From World
...reement on developing heavy crude oil deposits in the emirate, with a production target of 50,000 b/d by 2011, 250,000 b/d by 2015 and 700,000-900,000 b/d by 2020 (MEES, 29 October)....
Volume: 50Issue: 45Published at Mon, 05 Nov 2007 -
North Field Moratorium Could Extend To 2012, Says Suwaidi
...tablish the capacity of the field and decide whether we will want to continue upstream projects. So at this moment we are not sure which way it will go. We need to wait until 2011, 2012 before the study is finished. This is something very positive. We are trying to protect the existing projects and we’re...
Volume: 50Issue: 45Published at Mon, 05 Nov 2007