- Sort by:
- Score
- Published ▼
-
Kuwait Oil Sector Leadership Changes Aimed At Achieving Greater Upstream Efficiency
...oduction target of 50,000 b/d by 2011, 250,000 b/d by 2015 and 700,000-900,000 b/d by 2020. Discussions on the details of the project are continuing, with the hope that a final agreement can be reached by July 2008, KOC’s director of northern oilfield operations Khalid al-Sumaiti told a conference in th...
Volume: 50Issue: 44Published at Mon, 29 Oct 2007 -
Egypt Refinery At The Center Of Citadel Capital’s Energy Expansion
...d the two recently financed petrochemical ventures (MEES, 24 September). Held by Citadel, its co-investors and government-owned oil producer, the Egyptian General Petroleum Corporation (EGPC) through newly created Egyptian Refining Company (ERC), the refinery will start up in 2011 producing 2....
Volume: 50Issue: 44Published at Mon, 29 Oct 2007 -
Rising EPC Costs Heighten Gas Supply Concerns
...cause of the contracting situation,” the chairman of Qatargas Faisal al-Suwaidi told MEES on the sidelines of the Paris conference. “We’re studying the reserves. But the result of that will not come before 2010 or 2011. What I mean by thinking twice relates to the high prices in the contractors ma...
Volume: 50Issue: 43Published at Mon, 22 Oct 2007 -
Peace Deal Under Threat As SPLM Withdraws From Sudan’s Coalition Government
...jected the ABC’s report as “final and binding” because of its demographic implications. Local elections are due to take place in 2009. These will directly influence the outcome of the referendum on unity, scheduled for 2011, and by extension, how much of the disputed Abyei region’s oil wealth may be...
Volume: 50Issue: 43Published at Mon, 22 Oct 2007 -
Iran Establishes High Council To Draw Up Development Plan
...d has asked First Vice-President Parviz Davudi to oversee its establishment. The president has said that the plan, which is to start in March 2011, should be ready in 2010 after it is approved by the Supreme Leader Ayatollah Ali Khamenei and ratified by the cabinet and parliament. Mr Ahmadinejad sa...
Volume: 50Issue: 42Published at Mon, 15 Oct 2007 -
Foster Wheeler Awarded FEED, Management For Mesaieed Petrochemical Complex
...its, is scheduled for completion in 2011. ABB Lummus will supply process technology, with Basel supplying polypropylene technology....
Volume: 50Issue: 42Published at Mon, 15 Oct 2007 -
StatoilHydro’s Debut Marred By Hydro’s Libyan Probe
...d Block 146-1, both in the Murzuk Basin. In a statement, StatoilHydro said further exploration and development were under way in each area, and that as new fields were readied for production, a substantial increase in output was expected towards 2011. In addition to Hydro’s Libyan upstream as...
Volume: 50Issue: 41Published at Mon, 08 Oct 2007 -
MOU Signed For Qatar-Bahrain Causeway
...r the construction of the proposed causeway to link the two Gulf states. Work on the $2-3bn project will begin within seven months, with completion scheduled for 2011. The 40km causeway will provide road and rail links between Ras Ashiraj in northwest Qatar and Askar in southeast Bahrain. The tw...
Volume: 50Issue: 41Published at Mon, 08 Oct 2007 -
North Africa Targets 1.3Mn B/D New Refining Capacity By 2012 Despite Cost Threats
...mpletion in 2011. Separately, a $1.5bn contract for the construction of a fluid catalytic cracking unit (FCC) and 100,000 b/d fuel oil processor at 'Ain al-Sukhna in the Gulf of Suez is due to be awarded next month. Libyan Refinery Plans Languish Two decades of economic sanctions took their toll on...
Volume: 50Issue: 40Published at Mon, 01 Oct 2007 -
Norway’s NPD Forecasting 6% Annual Decline In Liquids Production To 2011
...Middle East Economic Survey VOL. L No 40 01-October-2007 Norway’s NPD Forecasting 6% Annual Decline In Liquids Production To 2011 Norway’s National Petroleum Directorate (NPD) has forecast a steady decline in liquids output over the period 2007-11, although rising gas production wi...
Volume: 50Issue: 40Published at Mon, 01 Oct 2007