1. Egypt To Issue Tender For Construction Of Two BOOT Power Plants

    ...sis through the year 2010 in an effort to meet domestic consumption needs which are rising at a rate of 7-8% per annum. The 15 power plants should raise the country’s generating capacity to 12,750MW by the year 2002, 17,000MW by 2007 and 27,500MW by 2017 (for a survey of Egypt’s power sector, see ME...

    Volume: 42
    Issue: 41
    Published at Mon, 11 Oct 1999