1. Caspian Oil And Gas Production Steady Through 1H 2001

    ...urces. Prior to the opening of the CPC pipeline, TCO had developed an export system using railcars and barges to Baltic, Central European and Black Sea destinations (MEES, 2 April).The CPC will have an initial capacity of 560,000 b/d, which is expected to increase to 1.36mn b/d by 2014 (MEES, 3 Se...

    Volume: 44
    Issue: 39
    Published at Mon, 24 Sep 2001
  2. Official Opening For CPC Pipeline Set For Late September

    ...creased to 1.36mn b/d by 2014 in order to accommodate TCO’s targeted output of 700,000 b/d from the Tengiz field, plus that of other regional producers. Equity interest in CPC is allocated as follows: Russian Federation (24%), Republic of Kazakstan (19%), Sultanate of Oman (7%), Chevron Caspian Pi...

    Volume: 44
    Issue: 36
    Published at Mon, 03 Sep 2001