1. Saudi Arabia In 550MW Turbines Award; 2014’s 8.2GW Start-Ups Hike Output

    ...-Khair (MEES, 2 January). PP12’s eight 7F.05 units are among 20 ordered earlier by SEC from GE. Twelve more will be delivered shortly for installation in the PP13 and PP14 plants, due online in 2017. Major power developments under way and planned in Saudi Arabia by end-2018 have combined ca...

    Volume: 58
    Issue: 02
    Published at Fri, 09 Jan 2015
  2. Cairo Begins To Restore Faith In Its Oil And Gas Sector

    ...oject, as well as 8-9mn barrels of condensate and 450,000 tons of LPG. Peak “incremental daily production” of 160mn cfd (27,000 boe/d) and 5,600 b/d condensate is expected to occur in 2017, the firm says. This implies that Dana’s total Egyptian output will by then top 70,000 boe/d. BG RECEIVABLES BA...

    Volume: 58
    Issue: 02
    Published at Fri, 09 Jan 2015
  3. New Gulf Petchems Start-Ups In Shadow Of Aramco Mega-Projects

    ...tsubishi Jubail, S Arabia 2017 250 MMA, 40 PMMA QP/Shell (Al-Karaana) Ras Laffan, Qatar 2017 1,500 MEG, 300 linear a-olefins SABIC Ju...

    Volume: 58
    Issue: 01
    Published at Fri, 02 Jan 2015
  4. MENA Power Survey: Generators Seek Fuel Diversity; Capacity Up 3.4% To 370GW

    ...rbine (CCGT) plant. However, the gas squeeze has forced the UAE to pursue nuclear power, renewables and also coal. Central to the UAE’s planning are four 1.4GW nuclear reactors being built at Barakah in Abu Dhabi for start-up at a rate of one per year during 2017-20. Ras al-Khaimah’s Utico is building a 27...

    Volume: 58
    Issue: 01
    Published at Fri, 02 Jan 2015