- Sort by:
- Score
- Published ▼
-
Kuwait, Oman And Qatar Push Refinery And Condensate Splitter Projects
...sref) 400,000 End 2014 UAE Ruwais 400,000 2013 10bn New refinery at sa...
Volume: 55Issue: 18Published at Mon, 30 Apr 2012 -
TransGlobe Targets Egyptian Growth Despite Delayed Payments
...ly 2011, first oil expected mid-2012 (800-1,200 b/d). Exploration permit expires June 2014. **South Alamein W Desert 50% (op)**, El Paso 50% 0 0 0** 20...
Volume: 55Issue: 18Published at Mon, 30 Apr 2012 -
Turkey And India Eyeing Qatari LNG
...r year to India in 2004, and a further 3.7 bcm/y beginning in January 2010. India is also set to purchase around 2 bcm/y of LNG from the $36.8bn Australian Gorgon project, beginning in 2014. Turkey And India LNG Imports In 2010 Turkey In...
Volume: 55Issue: 18Published at Mon, 30 Apr 2012 -
Abu Dhabi Burns More Crude And Gasoil To Meet Power Challenge
...ES at the Sour Oil and Gas Advanced Technology conference on 25-29 March. It will ramp up in 2015 to 500mn cfd of sales gas instead of the targeted 2014. Some estimates have shown Bab and offshore Hail each potentially providing 400-600mn cfd of sales gas, but Habshan 5 is not designed to handle the am...
Volume: 55Issue: 17Published at Mon, 23 Apr 2012 -
Oman Relies On PDO And BP To Meet Gas Challenge
...shore tight gas field, which it took over from BG in 2010. OOC will also take over Ras al-Khaimah Petroleum’s West Bukha offshore field in the Strait of Hormuz, bringing 45mn cfd of gas onshore to Oman instead of the UAE – its current destination – when its gas processing plant starts producing by 2014 (ME...
Volume: 55Issue: 16Published at Mon, 16 Apr 2012 -
Iran And Oman Developing Hormuz Gas Projects
...l Company’s (OOC’s) upstream subsidiary Oman Oil Company Exploration and Production (OOCEP) is building a 120mw power plant on the Musandam peninsula, which juts into the Strait of Hormuz. The plant – scheduled to be operational in 2014 – will use feedstock from the field, which currently goes to Ra...
Volume: 55Issue: 15Published at Mon, 09 Apr 2012 -
Dow Seeks Local Partner For New Coatings Plant
...nstructed in Jubail Industrial City, to be operational in 2014. It will be located next to the $20bn Sadara 3mn tons/year integrated petrochemical project which is being implemented by Dow and Saudi Aramco (MEES, 2 April). The spokesperson said that at this stage it is too early to say conclusively whether an...
Volume: 55Issue: 15Published at Mon, 09 Apr 2012 -
IOCs Offer Abu Dhabi CO2 Technology To Secure Oil Fields
...xonMobil (9.5% each) and Portugal’s Partex (2%) – expires in January 2014, and its international oil company (IOC) shareholders are nervous that its fields might be awarded to newcomers. In January, at Masdar’s World Future Energy Summit, ADNOC’s chief 'Abd Allah Nasir al-Suwaidi made a statement that was wi...
Volume: 55Issue: 14Published at Mon, 02 Apr 2012 -
Permit Approvals Set To Boost Apache’s Egyptian Production
...important component of its future Egyptian operations. Meanwhile, a compression project due onstream in 2014 will help prolong plateau wet gas production – and provide an initial 12,000 boe/d boost – at the Qasr field on the Faghur basin’s Khalda concession. ...
Volume: 55Issue: 14Published at Mon, 02 Apr 2012 -
Abu Dhabi To Import 1.2Bn CFD Of LNG, Shah Gas Field Slips
...UAE Abu Dhabi To Import 1.2Bn CFD Of LNG, Shah Gas Field Slips Abu Dhabi’s decision to start importing LNG in 2014-15 will put it into competition with Kuwait and Bahrain for floating regasification and storage units (FRSUs), whose market is tight. Positioning the terminal in Fu...
Volume: 55Issue: 13Published at Mon, 26 Mar 2012 -
BP Begins Production At North Shadwan
...EGYPT/EAST MEDITERRANEAN BP Begins Production At North Shadwan BP has started production from its North Shadwan block in Egypt’s Gulf of Suez. Initial production of 1,000 b/d from the block’s NS 377 field will ramp up to 12,000 by 2014 as two further fields on the block come on st...
Volume: 55Issue: 12Published at Mon, 19 Mar 2012 -
SEC Seeking Developers For Power Plant Based On Fuel Oil
...oviding equipment and start-up is scheduled for June 2014. SEC’s second IPP, a Riyadh gas-fired project, is being developed by GDF Suez, Aljomaih Holding Company of Saudi Arabia and Sojitz Corporation of Japan. Commonly known as PP11, it will generate 1.73gw, with early power expected by May 20...
Volume: 55Issue: 12Published at Mon, 19 Mar 2012 -
Korean Group Wins Abu Dhabi Oil Deal As ADCO Concession Nears Expiry
...ports. The concession for the ADCO consortium – ADNOC (60%), Shell, Total, BP and ExxonMobil (9.5% each) and Portugal’s Partex (2%) – will expire in January 2014. An international oil company (IOC) official, whose firm plans to compete when the ADCO concession ends, tells MEES about the Korean deal: “I su...
Volume: 55Issue: 11Published at Mon, 12 Mar 2012 -
Kuwait’s Jurassic Gas Project Hits More Problems
...oduce 50-60mn cfd of associated gas. Onshore, a project in Wafra field will collect 100mn cfd of associated gas by 2014 to use for in-field power generation. KNPC and KOC have programs to reduce flaring, but do not publish figures. KOC is relying on exploration to find 1bn cfd of non-as...
Volume: 55Issue: 10Published at Mon, 05 Mar 2012 -
Australia’s Beach Sees ‘Imminent’ Start to Egyptian Production
...ys initial production from the BP-operated block is “imminent”, with first oil coming from the NS 377 field. Production is set to build to around 12,000 b/d by 2014 as other fields come on stream. Of the block’s discoveries, NS 377 is the nearest to the Sinai coast (see map). Production fr...
Volume: 55Issue: 10Published at Mon, 05 Mar 2012 -
Political Comment (5 March 2012)
...id and issued at the meeting of the enemies of Syria in Tunis" and to press ahead with Mr Asad's 26 February referendum on a new constitution, which would allow the president to serve two further seven-year terms when his current term expires in 2014. (According to the government, the constitution wa...
Volume: 55Issue: 10Published at Mon, 05 Mar 2012 -
Bahrain Discovers New Crudes As Gas Plans Take Shape
...eds to be reinjected to maintain reservoir pressure. It is envisaged that the increased gas contribution from Tatweer will tide Bahrain over until the proposed LNG import terminal is completed towards the end of 2014 and new gas sources are found on and offshore, said Dr Mirza, noting that NOGA is...
Volume: 55Issue: 09Published at Mon, 27 Feb 2012 -
Alnaft Says $1.5Bn Timimoun Project Set For 2014 Start-Up
...ALGERIA Alnaft Says $1.5Bn Timimoun Project Set For 2014 Start-Up Algeria’s Southwest Gas Project appears ready to take a further step forward. Sid Ali Berata, chairman of Algeria’s upstream regulator Alnaft, told the country’s state news agency APS that investment in the Total-led Ti...
Volume: 55Issue: 09Published at Mon, 27 Feb 2012 -
BP Sees North Africa As Key Exploration Area
...t to recover an estimated 5 tcf of gas and associated condensate though the subsea development of five offshore fields into a new onshore gas plant, with first gas anticipated for late 2014 (MEES, 26 July 2010). Algerian investment Of the company’s “key global projects” slated to come on st...
Volume: 55Issue: 09Published at Mon, 27 Feb 2012 -
Saudi Aramco And Pertamina Sign MOU For 300,000 B/D Java Refinery
...gineering packages are in the process of getting awarded (MEES, 1 August 2011). But an official green light for a major expansion at Petro Rabigh is still being delayed. A final investment decision (FID) was originally to have been made in late 2010/early 2011, to allow for start-up in 2014. But partner Su...
Volume: 55Issue: 09Published at Mon, 27 Feb 2012