- Sort by:
- Score
- Published ▼
-
6.4GW Of Hydropower Capacity To Be Added By Iran Over Next Five Years
...velopment program would raise Iran’s hydropower capacity from 4.783gw today to 11.169gw by the end of March 2011. Iran aims to raise its total power generating capacity from 40gw today to 55gw in 2010 (MEES, 27 February 2006)....
Volume: 49Issue: 31Published at Mon, 31 Jul 2006 -
Saudi Aramco And Refinery Project Partners Seek Financial Advisors
...gned a memorandum of understanding (MOU) to develop a refinery on 21 May and ConocoPhillips followed suit on 24 May (MEES, 29 May). The refineries will process Arabian Heavy crude to produce high-quality refined products and are targeted for start-up in 2011. Both MOUs envisage the joint venture pa...
Volume: 49Issue: 30Published at Mon, 24 Jul 2006 -
Pars LNG And PTT Sign LNG Supply MOU
...nsortium and Thai state form PTT signed a memorandum of understanding (MOU) on 1 July for the delivery of 3mn tons/year of Iranian LNG to Thailand beginning in 2011. The Pars LNG export scheme will comprise a twin-train 10mn t/y LNG plant supplied with gas from Phase 11 of Iran’s offshore South Pars fi...
Volume: 49Issue: 28Published at Mon, 10 Jul 2006 -
EU Studying Trans-Caspian Gas Pipeline Options
...ter this year. The project was inaugurated in July 2005 and has received financial backing from the European Investment Bank (MEES, 13 February, 11 July 2005). The pipeline is to be extended across northern Greece and the Adriatic to southern Italy for delivery of Shah Deniz gas by around 2011. Th...
Volume: 49Issue: 26Published at Mon, 26 Jun 2006 -
Bush Calls For Acceleration Of Shah Deniz Project
...will peak with production at around 9bcm/y. Stage 1 investment, including the SCP, will be around $4.2bn. Stage 2 is to come on-stream in 2011-12 with a capacity of 16bcm/y. The current plan calls for Stage 2 gas to be shipped across northern Greece to Italy (MEES, 5 June). Other recent de...
Volume: 49Issue: 24Published at Mon, 12 Jun 2006 -
Azerbaijan Ready To Supply Gas To Europe, Says Aliyev
...m/y. Stage 2 of the Shah Deniz project is set to be completed in 2011. With that, gas shipments from Azerbaijan are expected to extend to Italy via a pipeline across northern Greece and a subsea pipeline across the Adriatic Sea (MEES, 8 May, 13 February, 23 May 2005). Plans to develop Shah Deniz as...
Volume: 49Issue: 23Published at Mon, 05 Jun 2006 -
QP Launches $650Mn Eurobond
...osing on 26 May. The issue amount was $650mn with a maturity date of 30 May 2011. The coupon is 5.579% and the bond is priced at par, with a spread at 65bps over treasuries. The funds are to be used to refinance earlier, more expensive debt, and for general purposes. QP said earlier this year that it...
Volume: 49Issue: 22Published at Mon, 29 May 2006 -
Total, ConocoPhillips Sign Up For JV Export Refineries in Jubail And Yanbu'
...ocess Arabian Heavy crude and will produce high–quality refined products that meet current and future product specifications, Saudi Aramco said. The project is scheduled to start up in 2011. The MOU lays down the key parameters of the venture, the project configuration and a broad range of the major te...
Volume: 49Issue: 22Published at Mon, 29 May 2006 -
Paris Club Accepts Algeria’s Offer To Prepay $8Bn Debt
...rway, Spain, Sweden, Switzerland, the UK and the US. The debt owed to Paris Club creditors and eligible to the prepayment operations was, under the rescheduling agreements of 1994 and 1995, to be repaid between 30 November 2006 and 30 November 2011. Algeria’ offer reflects its strong financial re...
Volume: 49Issue: 20Published at Mon, 15 May 2006 -
S&P, Moody’s Assign Rating To Qatar Petroleum’s Eurobond
...Middle East Economic Survey VOL. XLIX No 20 15-May-2006 QATAR S&P, Moody’s Assign Rating To Qatar Petroleum’s Eurobond Standard & Poor’s (S&P) and Moody’s have assigned ratings for Qatar Petroleum’s (QP) eurobond issue, maturing in May 2011, which was in the process of being ma...
Volume: 49Issue: 20Published at Mon, 15 May 2006 -
Nama Plans $6Bn Jubail Private Export Refinery Venture
...ivate sector crude oil export refinery at Jubail with capacity of 400,000 b/d, at an estimated cost of $6bn. The facility would also produce petrochemicals. A Nama statement said the company was evaluating several potential joint venture partners. Start-up is projected for 2011. Earlier this year Na...
Volume: 49Issue: 20Published at Mon, 15 May 2006 -
Technical Bids For New 300,000 B/D Tiaret Refinery Due
...heduled to be awarded by end-July, with work beginning in 2007 and finishing in 2011. The refinery will process Saharan Blend crude and is part of Algeria’s plan to eventually double output from its current 450,000 b/d capacity. The products are to be marketed mainly in the Atlantic Basin, with some us...
Volume: 49Issue: 15Published at Mon, 10 Apr 2006 -
Turkmenistan And China Sign Gas Supply/Pipeline Agreement
...ase 2 (2006-10) covers the development of offshore fields ($12.8bn investment); Phase 3 (2011-15) will focus on control of oil and gas production ($16.8bn). Kazakhstan has identified up to 29 offshore prospects in its section of the Caspian. The European Commission has recommended th...
Volume: 49Issue: 15Published at Mon, 10 Apr 2006 -
Egypt Looks To Attract $20Bn Investment To Hydrocarbon Sector
...w 300,000 b/d refinery at Kafr al-Shaikh in the Nile Delta and was planning to build two more refineries in the Suez region with investments made by Saudi Arabia and Kuwait. The Kafr al-Shaikh project is planned for completion in 2011. Earlier this month, Mr Fahmy told MEES that Egypt was co...
Volume: 49Issue: 12Published at Mon, 20 Mar 2006 -
Kazakhstan And China Inaugurate Crude Oil Pipeline
...zMunaiGaz, which put the cost of the project at $806mn. Deliveries of Kazakh oil from the central Kumkol district should arrive at the Chinese border by the middle of 2006. The project calls for capacity to be increased to 20mn t/y (400,000 b/d) by 2011 and at some point the pipeline may be used to tr...
Volume: 48Issue: 51Published at Mon, 19 Dec 2005 -
Bahr Al-'Ulum Sets Sights On 3Mn B/D Oil Output By End 2006
...-'Ulum said that Iraq would increase oil production from 1.8mn b/d to 2mn b/d by the end of the year (MEES, 28 November). He added that Iraq aimed to lift production to 3.5mn b/d within the next two years and on to 6mn b/d by 2011. Iraq produced 1.65mn b/d in November according to MEES es...
Volume: 48Issue: 51Published at Mon, 19 Dec 2005 -
Qatar GTL Developments On Track, Says ʹAttiyah
...iftly by Phase-2. Finally, ExxonMobil’s integrated 154,000 b/d GTL project is on schedule for 2011 start-up, he said. “Our strategy is to achieve best utilization of our country’s natural resources and to diversify the gas industry; GTL provides the true opportunity in terms of scale and technology to...
Volume: 48Issue: 49Published at Mon, 05 Dec 2005 -
Bahr Al-ʹUlum Sees Iraqi Oil Output At 2Mn B/D By End-2005
...eaking in Qatar, Dr Bahr al-ʹUlum said Iraq aimed to lift production to 3.5mn b/d within the next two years and on to 6mn b/d by 2011. Addressing delegates at the International Petroleum Technology Conference in Doha, the minister warned that development of the oil sector was intractably linked with po...
Volume: 48Issue: 48Published at Mon, 28 Nov 2005 -
NIORDC Aims To Raise Gasoline Production Capacity To 767,380 B/D By 2010
...owth, and with capacity expansion proceeding as planned, consumption would reach 607,600 b/d by end-March 2010 and 668,360 b/d by end-March 2011, so that the incremental capacity would take Iranian gasoline production back into surplus....
Volume: 48Issue: 38Published at Mon, 19 Sep 2005 -
S&P Assigns Preliminary Ratings On Egyptian General Petroleum Export Notes
...be due in June 2011 while the class A-2 notes are expected to be due in June 2010. The weighted-average lives of the notes are expected to be 3.57 years for the A-1 notes, 2.79 years for the A-2 notes, and 3.57 years for the A-3 notes....
Volume: 48Issue: 28Published at Mon, 11 Jul 2005