- Sort by:
- Score
- Published ▼
-
Engineering Consultancy Awarded For Merowe Hydro Project
...der consideration could bring an additional 763mw of generating capacity online in the period to 2010 (see tables). According to government figures, power demand expressed in tons of oil equivalent (toe) is expected to rise to 342toe in 2002, 442toe in 2005, 794toe in 2010 and 1,309toe in 2014. Su...
Volume: 45Issue: 22Published at Mon, 03 Jun 2002 -
Existing Caspian Discoveries Could Produce 2.8-3.8Mn B/D By 2015, Says Wood Mackenzie
...to consideration, the overall Caspian profile has a risked peak production of 2.8mn b/d in 2014 compared with 4mn b/d in the unrisked case. “The significant difference between the unrisked and risk profiles represents the loss due to exploration failure or delays as a result of technical or market-re...
Volume: 45Issue: 19Published at Mon, 13 May 2002 -
Importing Water From Iran Would Lead To Higher Consumer Prices, Parliament Hears
...quirements in 2001 totaled 266mn gallons/day, and are expected to rise to 477mn g/d in 2014, 587mn g/d in 2021, and 645mn g/d in 2025. The project to import water from Iran has been proposed by a UK-registered consortium, Gulf Utilities, comprised of Kuwait’s Gulf Water Company and Energy Investment Co...
Volume: 45Issue: 08Published at Mon, 25 Feb 2002